• Skip to primary navigation
  • Skip to main content
Contact
Beech Village Hall logo

clientsite.uk

  • What’s on
    • What’s on
    • Browse events
    • Booking information
    • Beyond Beech
  • Health & Wellbeing
    • Health & Wellbeing
    • Meet our Practitioners
    • Join our Practitioner community
  • Hire a space
    • Hire a space
      • Hire a space
      • Celebrations and Life Events
      • Children’s parties
      • Commemorations
      • Groups and organisations
      • Wedding receptions
    • Check availability
      • Check availability
      • Main Hall availability
      • The Wellhouse availability
    • Find caterers and suppliers
    • Packages and pricing
  • Community
    • Community
    • Community Groups and Clubs
    • Members’ corner
    • Browse Volunteer roles
    • Community information

How to hire and set up the Marquee?

4 January, 2024

We have a large Marquee measuring 6m x 12m and this can be placed on our village green outside the hall. The Marquee has side panels but does not have a floor.

The Marquee is available for hire where the hirer commits to set up and take down the Marquee.

  • Setting up and taking down the Marquee requires a team of 10 people for 2-3 hours
  • The video below steps through the process for a similar marquee.

Marquee set up Safety Basics

A quick guide for volunteers helping put up or take down our 6m x 12m marquee and 3m x 6m stage.

1. Lifting and Carrying

  • Never lift alone. Poles, stage decks, and folded marquee sections are heavy and awkward — always use a two- or four-person lift for anything bulky.
  • Plan before you lift. Agree who’s carrying, where it’s going, and clear the path first.
  • Use good technique: feet shoulder-width apart, bend your knees (not your back), keep the load close to your body, and avoid twisting — turn your feet instead.
  • Lift in stages for heavy or high items (e.g. stage sections onto trestles) — rest the load partway if needed rather than forcing it in one go.
  • Know your limits. If it feels too heavy or unbalanced, stop and get more hands or a trolley/sack truck.
  • Free official training: HSE – Good Manual Handling Technique

2. Gloves

  • Wear gloves whenever handling poles, stakes, guy ropes, or stage frames — they protect against splinters, pinch points, and rope burn.
  • Use grip-palm work gloves for general rigging; consider cut-resistant gloves if handling metal edges or cutting cord.
  • Remove gloves (or use snug-fitting ones) around power tools such as drills, to avoid snagging.

3. Trip Hazards

  • Stakes and pegs: flag with hi-vis tape or cones until guy ropes are tensioned and the layout is finished.
  • Guy ropes and cables: keep walkways clear; route power cables away from foot traffic or cover them.
  • Ground clutter: clear packaging, tools, and offcuts as you go — don’t wait until the end.
  • Uneven ground: watch for holes, tent pegs, and cabling especially in low light — consider temporary lighting for early morning or evening builds.

4. General Reminders

  • Wear sturdy, closed-toe boots — no sandals or trainers.
  • Take regular breaks, especially in hot weather or during long build days.
  • Report any near-misses or injuries.

  • About
  • FAQ
  • Legal